Private Limited No: 162233/073/074
Registration Number: 604389071
Intake Site: – Patha Uttar Ganga Rural Municipality Word No: -3
Power House Site: – Patha Uttar Ganga Rural Municipality Word No: -4
Latitude: – 28 39’ 58”,28 42’ 47”
Longitude: -82 48’17”, 82 52’ 25”
Undertaken Co. Dhorpartan Ranma Hydropower (P). Ltd.
Type of Scheme: – Peaking Run of River
Gross Head: – 475m
Net Head: – 459.00m
Installed Capacity: – 30,000.200 kw
Hydrology Catchment Area: – 298 km2
Design Discharge: – 9.60m3/s Q40%
Dry min Discharge: – 4.90m3/s
Design Flood Discharge: – 15m3/s (Yr. Flood)
Length of Weir: – 18 to 20 m
Max. Height of Weir: -15.00 m from foundation level
Crest Elevation: – EL. 2020 to 2035.m
Intake Structure Under Ground /Surface
Gravel Trap Under Ground / Surface
Approach Canal Under Ground / Surface
Settling Basin Under Ground / Surface
Headrace Tunnel Section Type: – Inverted-D
Length: – 4500 M
Size : – 3 m (W) x (H)
Support: – Shotcrete, Ribs, Rock bolt
Penstock Length: – 1000.351km
Powerhouse Type: – Surface
Tailrace Type: – Free Flow, Box Culvert
Turbine Type: – 2no.
Governor Type: -Transformer Type: – 1no
Length: – The 11km long transmission line up to substation at Sisne which is under construction in East Rukum district proposed 132kv/33kv Substation Sisne at East Rukum which is under construction 11 km form
Power House of the Ranma khola Hydroelectric Project.
Voltage: – 132 KV
Power and Energy Generation Annual energy per year (…………………………)
Kathmandu to Site: – 1 days(495km)
District Headquarter to Site: – 79 Km Road to be Newly Construction
unto Intake & Power House 2km Which is under construction.
Feasibility Study: – 2Year.
Construction :- 3Years.
24 Project Cost Total Project Cost: – 5.20 billion